PROJECT OVERVIEW
Custom 6-foot CMU block wall with decorative cap and wrought-iron gate.
THE CHALLENGE
Uneven lot with a 3-foot grade change across the wall line.
OUR SOLUTION
Designed stepped footing system while maintaining level wall cap.
GALLERY
PROJECT GALLERY
Footing
Footing
Block laying
Block laying
Completed
Completed
TIMELINE
OUR PROCESS
01
Excavation
Marked wall line, excavated stepped footing trench.
02
Construction
Laid CMU blocks with grouted cores.